How to build automated assembly line?

by:YiFan Conveyor     2020-09-21
The use of assembly line has completely popularity in the industry production, mobile phones, electrical appliances, computers, air conditioning and other spare parts in the assembly and packing for final product will be used when assembly line in transmission. Industry competition pressure, so production efficiency, to ascend as a condition, the construction of a pipeline to the advantage of automation is improved for the past cumbersome manual operation, makes a more simple to achieve the different positions in the workplace. But the factory need to be prepared for the related equipment in the early production, so how to make the construction of the pipeline automation? Despite the look line of related programming and design work is very complex, but it is only for factory production lines. Determine the type and quantity, also can make an appointment for installation, because part of the venue early foundation decorate not ready, so is behind for mechanical equipment to admission, so can also determine the installation time, convenient to ensure customers with overall plan, also won't delay to start. Admission line accessories manufacturers can provide services such as handling and installation, to ensure the customer's responsibility to use only. Debugging after the installation is complete, the other will be carried out in a test run, commissioning commonly when can let a customer acceptance personnel to be present, to ensure that the acceptance of a complete set of pipelining equipment can normal operation, at the same time will teach the customer designated operators of assembly line work some routine use way, such as speed adjustment, daily use the matters needing attention, the conventional fault handling. For customer get is provided by the manufacturer has been debugged the system, can only need to switch operation and understand how to adjust the speed you would be able to use. Prophase planning and building work should be how to do? These are really don't need to worry about users. Understand put site area, for the use of line number, the main production equipment, the manufacturer will recommend the corresponding style and length for the customer, convenient installation at the time of the environment, is suitable for the position, such as how to install if the customer not planning, factory technical service can provide help. So a few small problems can deal directly with, and if found of production assembly line there is a fault, can timely contact manufacturer after-sales, determine the fault timely treatment, to avoid forced to continue to use cause more serious failure.
Custom message
Chat Online
Chat Online
Leave Your Message inputting...
Ningbo YiFan Conveyor Equipment Co.,Ltd
Sign in with: